we discuss the effect of workload
variance to the cost of Star Student Project application and
study the possible benefits of workloadbased partitioning. Star
Student Project NPV over a year time horizon for TPC-W. We
consider three different workload intensity of small Star Student
Project, medium workload intensity and high workload intensity
Star Student Project with two different workload growth rate
of Star Student Project percent per year. Star Student
Project Workload Intensity and Growth We first conduct our study
on the effect of workload Star Student Project intensity and
growth rates over varying operational Star Student Project
periods.